Anchoring & Mooring For Floating Solar Photovoltaic Systems (FSPV) and Ground Mounted
Our capabilities is to provide services according to project stage:
Initial Planning
– Feasibility study, potential study and site evaluation
Preliminary Design Stage
– Site selection, desk study and data collection, site investigation, risk assessment, prelim design
Detailed Design Stage
– Authorities submission and approval, detailed design
Construction
– Site Supervision, Technical Advisory, Final Inspection & Testing, As-built Checking
Structure Building Integrity
Structural Integrity Check shall be perform prior Solar PV panel installation on rooftop buildings.
SCGi providing services for Structural Integrity Check as follows:
Site assessment, data collection and evaluation of existing structure
Perform structural analysis with additional PV Panel Loads
Produce Analysis Design Report on the Structure
Advise client on the related structural works associate with PV Panel installation.
Detail Design Consultancy For Smart Transformer Station (STS) Structure
Detail Design Consultancy For Smart Transformer Station (STS) Structure
DESIGN ANALYSIS USING STRUCTURAL DESIGN SOFTWARE FOR HSBC BUILDING WITH THE ADDITIONAL SOLAR PANEL LOADING IMPOSED LOADS ON EXISTING ROOF
THE ADDITIONAL SOLAR PANEL LOADING AND IMPOSED LOADS ON EXISTING ROOF.
P8 - TNB IF & SPP IF
PS RAWANG(29.92kW),
PS ULU BERNAM(24.48kW),
PS SG BULOH LAY BY(27.20kW),
PS RASAH (19.04kW),
PS SRI HARTAMAS (27.20kW)
TATAWA INDUSTRIES (M) SDN BHD (336.5 kWp)
MYDIN PULAU SEBANG (1.64 MWp)
MAGNUM CABLE SDN. BHD (275.4 kWp)
EL COLD CHAIN LOGISTICS SDN BHD (248.24 kWp)
IOI PROPERTIES GROUP BERHAD (214.38 kWp)
EASTOOL INDUSTRIES SDN. BHD (231.1 kWp + 210.1 kWp)
HWA TAI INDUSTRIES BERHAD (110 kWp +380 kWp)
TEH FRUITS SDN. BHD (301.4kWp)